SOLAR WIND HYDRO DESIGN BUILD
 
ONLINE
MEMBERSHIP
Email:
Password: [forgot it?]
Remember me?
Yes No
 
MAGAZINE
PRINT EDITION
SUBSCRIBE | RENEW
CURRENT ISSUE
 
 
SAMPLE ISSUE

CONTACT US
 
 
 
Home » Article My Account | View Cart
 
Ask the Experts: PV System Labels
By Matthew Dickey
Aug/Sep 2009 (#132) pp. 36-37
Introductory Level
 

The 2008 National Electrical Code (NEC) requires signage on various parts of PV systems. What are the specific requirements for each sign? Where can I buy these signs? I want to have them in place before the rough-in inspection.

Roger Carver • Nucla, Colorado

Section 690 of the NEC specifies requirements for labeling PV systems. There are multiple labeling requirements, and they are spread out among several subsections. The labels are required to be a durable, unalterable material permanently attached to the device. The most common type of labeling is engraved or etched plastic, which can be riveted or adhered to the device.

The first NEC requirement is that the PV power source information be posted at the DC disconnect, which can also be part of the inverter. Section 690.53 lists the posting requirements: rated maximum powerpoint current, rated maximum power-point voltage, maximum system voltage, and short-circuit current. According to 690.14(C)(2), if there is more than one PV DC disconnect, they should also be labeled.

The NEC also requires other labels for:

  • The DC disconnect, noting that the line and load sides may be energized in the open position (NEC 690.17).
  • The AC disconnect—stating the rated AC output current and nominal operating AC voltage (as stipulated by NEC Sections 690.14[C][2] and 690.54).
  • At the location of the ground-fault protection, normally at the inverter, warning of a shock hazard (NEC 690.5[C]).
  • Where the solar-electric system interconnects to the utility (NEC 690.54).

Photovoltaic systems that include batteries have a few other labeling requirements. In addition to NEC requirements, it is a good idea to also label other DC enclosures, the utility disconnect, and combiner boxes with fuses, while also providing information at the utility meter that there is a PV system connected.

Try your local sign-making or trophy shop for pricing. Tyco (www.tycoelectronics.com) makes some labels that may meet your needs. And be sure to pay attention to NEC Section 690 for any labeling changes that might come up.

Matthew Dickey, Argand Energy Solutions • Charlotte, North Carolina

 

Similar Articles:
PV Energy Payback
By Justine Sanchez
Issue: Oct/Nov 2008 (#127)
It takes energy to make energy, but just how much? Photovoltaic modules recover their embodied energy very quickly.

Low-Voltage PV Wire Sizing Economics   Online Membership Required
By Kent Osterberg
Issue: Dec/Jan 2005 (#104)
Balancing cost and voltage drop when choosing low-voltage DC wire.

PV Module Buyer's Guide   Online Membership Required
By Justine Sanchez
Issue: Dec/Jan 2009 (#128)
Our annual guide to choosing the right PV modules for your solar-electric system.

Code Corner: Codes and Standards: Cost and Performance Impacts
By John Wiles
Issue: Oct/Nov 1996 (#55)
John Wiles answers the charges that NEC compliance costs too much and imposes performance penalties in small scale RE systems.

Code Corner: Ground-Fault Protection is Expanding
By John Wiles
Issue: Feb/Mar 2008 (#123)

 
Attn. School Libraries
Free subscriptions to Home Power for K-12 school libraries.
http://redwoodalliance.org
 
My Account | View Cart | Contact | Advertise | Terms of Use | Privacy Policy
Copyright © 1987-2010 Home Power Inc. All rights reserved.